Sunday, May 26, 2013

Life's ups and downs

Just when all is going well in life, perhaps too well, all of a sudden reality kicks in and you can suddenly, tragically and unexpectedly be blindsided.

After the delivery of the boat to Montenegro, I arranged for her to be lifted and anti-fouled.

This all went without a hitch and the following Saturday NS was sporting a brand new painted bottom.


Delivering the new boat - Italy to Montenegro

Time rolls on as time tends to do, which is my way of saying even with the best of intentions to update this blog on a regular basis, I have not been so diligent.
So 5 weeks after the delivery from Italy to Montenegro, here is the account of it as best as I can remember.

Myself, JS and AS arrived on the boat at 2030 after a flight from Montenegro to Slovenia and a 2 hour drive to the boat, only to be greeted by the engineers who where madly trying to finish off the jobs that should have been completed weeks earlier! All in all though the guys did do a reasonable job and we had no major issues on the trip.
The provisions went aboard along with several cases of Italian wine that is so hard to find in Montenegro. Systems were tested, the spotlight rigged up to a spare battery (this was essential for navigating out of the narrow channel from the marina to the Adriatic sea), fuel was delivered by jerry can with the help of a couple of great friends who also had a boat near by (thanks guys!), a pizza eaten, immigration taken care of, 101 things madly stowed, and we were away by 0200.
After a slow meander through a very narrow channel on a moonless night where the spotlight came into its own by illuminating the post that were spaced every 100 meters or so, we headed out into open sea bound for Croatia.
Heading for the Adriatic